TRAFFIC SIGNAL MANAGEMENT SYSTEM

Static vs Dynamic Real-Time Comparison Junction simulation

STATIC SIGNAL CONTROL

SURAT, GUJARAT
LIVE STATS
00:00
PASSED:(+0%) 0
AVG WAIT:(+0%) 0.0s
AVG TRANSIT:(+0%) 0.0s
THROUGHPUT:(+0%) 0.0/m
WAITING VEH:(+0%) 0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0

LIVE ANALYTICS

WAITING
TOTAL PASSED
0
(+0%)
vehicles through junction
AVG WAIT TIME
0.0s
(+0%)
at signal stop line
AVG TRANSIT TIME
0.0s
(+0%)
spawn to exit
THROUGHPUT
0.0
(+0%)
vehicles / minute

VEHICLES BY TYPE

CAR
0
SCOOTER
0
AUTO
0
TRUCK
0
BUS
0

WAITING VEHICLES OVER TIME

PER-ROAD BREAKDOWN

ROADPASSEDAVG WAITSHARE
North Road00.0s0%
East Road00.0s0%
South Road00.0s0%
West Road00.0s0%
ELAPSED: 0.0s · 0 EVENTS IN BUFFER

DYNAMIC SIGNAL CONTROL

SURAT, GUJARAT
LIVE STATS
00:00
PASSED:(+0%) 0
AVG WAIT:(+0%) 0.0s
AVG TRANSIT:(+0%) 0.0s
THROUGHPUT:(+0%) 0.0/m
WAITING VEH:(+0%) 0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0
TOTAL0
CAR
0
SCOOT
0
AUTO
0
TRUCK
0
BUS
0

LIVE ANALYTICS

WAITING
TOTAL PASSED
0
(+0%)
vehicles through junction
AVG WAIT TIME
0.0s
(+0%)
at signal stop line
AVG TRANSIT TIME
0.0s
(+0%)
spawn to exit
THROUGHPUT
0.0
(+0%)
vehicles / minute

VEHICLES BY TYPE

CAR
0
SCOOTER
0
AUTO
0
TRUCK
0
BUS
0

WAITING VEHICLES OVER TIME

PER-ROAD BREAKDOWN

ROADPASSEDAVG WAITSHARE
North Road00.0s0%
East Road00.0s0%
South Road00.0s0%
West Road00.0s0%
ELAPSED: 0.0s · 0 EVENTS IN BUFFER

PHASE LOGS

0 EVENTS
No logs yet. Simulation must be running.

PHASE LOGS

0 EVENTS
No logs yet. Simulation must be running.

SYSTEM COMPARISON NOTES